Berths No.25 and 26 at Basrah Gateway Terminal (BGT)

For phase 2 of the Three Berths contract with International Container Terminal Services Inc. (ICTSI)/Basrah Gateway Terminal (BGT) in Umm Qasr Port, Basrah Mas proceeded with the construction of Berths No. 25 and 26 with a quay structure of 300 m X 42 m and more than 250,000 m2 of stacking yards.